Wastewater Treatment Plant – Capacity Definition & Interim Upgrade

A town wastewater treatment plant (WWTP) constructed in 1961 and upgraded in 1969 required updated process and hydraulic flow diagrams to define the plant capacity with respect to urban development objectives. Sewer flow monitoring was also completed. WISE completed engineering calculations, drawings and flow analysis to design interim upgrades to the WWTP which could enable urban development while longer term planning for the WWTP was conducted.

Read More
Burrup Seawater Scheme – Asset Management Plan

The Burrup Seawater Scheme is a non-standard scheme asset for the Water Corporation. WISE developed an asset management plan to deliver compliance with contractual, legislated and regulatory commitments within the Corporation’s standard asset management framework and software systems. Integral to the asset management plan was the incorporation of the engineering design criteria which differ from water and sewer systems. Minor works projects were recommended to optimise the scheme for the seawater product.

Read More