ater nfrastructure cience & ngineering
Wastewater Treatment Plant – Capacity Definition & Interim Upgrade
Rio Tinto
2011

A town wastewater treatment plant (WWTP) constructed in 1961 and upgraded in 1969 required updated process and hydraulic flow diagrams to define the plant capacity with respect to urban development objectives. Sewer flow monitoring was also completed. WISE completed engineering calculations, drawings and flow analysis to design interim upgrades to the WWTP which could enable urban development while longer term planning for the WWTP was conducted.