ater nfrastructure cience & ngineering
Wickham Distribution Main DN400 Re-alignment
Water Corporation
2012,2014

WISE completed design of DN400 MSCL pipe realignment to Water Corporation standards. Safety in design minimised welding requirements in address of deep trenching requirements due to crossing drainage lines. The design was reviewed to incorporate short tie-in period during construction due to the limited shut down period of the singular distribution main.